TheGridNet
The Chicago Grid Chicago

NASA says Artemis III is on track for summer 2027, a two-week orbital test before a 2028 moon landin

Four astronauts will spend about 14 days in low-Earth orbit testing systems needed for future lunar landings, NASA says. The mission is meant to lay the groundwork for returning Americans to the moon in 2028. NASA is planning Artemis III, a two-week orbital test before a 2028 moon land landing, for summer 2027. Four astronauts will spend about 14 days in low-Earth orbit testing systems needed for future lunar landings. The mission aims to lay the groundwork for returning Americans to the moon in 2028.

NASA says Artemis III is on track for summer 2027, a two-week orbital test before a 2028 moon landin

Publié : il y a 16 heures par dans Science

NASA says Artemis III is on track for summer 2027, a two-week orbital test before a 2028 moon landin Four astronauts will spend about 14 days in low-Earth orbit testing systems needed for future lunar... [309 symbols]


Les sujets: Space, NASA

Read at original source